Rate can be assigned to shift/program in the following ways. There are two types of rates:
- Base rate : These are rates that is already assigned to the "Area"
- Over-ride rates : These rates are the rates those are used when you do not want apply base rate to the shift.
System automatically picks up base rate from the area shift/program is saved in. In order, to learn more about "How to input rates" please refer to Rates.
You can override base rate by going to the shift, then click on "Select Client". Following box will open. Click on Rate (drop down section) located top left of the page. From this drop down section select the rate you want to apply to your shift.
You can go to client's "Shift Breakdown' page in order to see rates applied to the client.
Comments
0 comments
Please sign in to leave a comment.